Bagsheyna's FotoPage

By: bagsheyna lagoon

[Recommend this Fotopage] | [Share this Fotopage]
[<<  <  [1]  2  3  >  >>]    [Archive]
Wednesday, 13-Aug-2008 09:03 Email | Share | | Bookmark
HoMe SwEeT hOmE :)))))



Yes, that’s our house!!!! Our house!!!! The feeling of seeing our own house is indescribable.
Mixture of everything,..mostly good feelings.
We didnt go inside the house for safety reasons ( not to mention 2-3 kali kena sound dengan mamat yg incharge on site , dia mmg tak bagi masuk langsung)
But we are pleased with the security around that area. Bagus la..diorang buat keje diorang. Selagi tak dapat kunci, they will not allowed us to go inside our house.
Hopefully by October we will get our keys.


Tuesday, 3-Jun-2008 12:00 Email | Share | | Bookmark
Progress Pictures of Lagoon Homes

Here are a few progress pictures of our beloved soon-to-be home. Enjoy!

Pictures courtesy of:
http://lagoon-homes.blogspot.com
http://tagnox.blogspot.com






Friday, 30-May-2008 07:08 Email | Share | | Bookmark
Kitchen

Tomorrow we will start our kitchen hunt. Budget is our constraint right now and we need to have 2 kitchen in our house. Wet & dry. Basically we have our own basic ideas on how both kitchen gonna look like..and tomorrow we gonna go more into details on the design, materials, fittings and equipment.
Again..budget is our main constraint. We need to work on whatever resources we have and try not to burst the budget (that's the toughest part) .

We are planning to visit showrooms around Kota Damansara area.

below are some tips we get from www.signaturekitchen.com.my

Tips & Guides

Step 1
List out your requirements on a piece of paper such as


• How many appliances do you want in the kitchen?
• What do you want eg. Working space, open concept, etc.

Step 2
Selection of shops and check on their credibility


• Visit their showrooms and check on their workmanship.
• Get sound advice from the kitchen consultant
• Have a wide range of products.
• If any, provide flexible payment scheme.
• Bring along your floor plan.

Step 3
Finalized design


• Ensure that all matters eg. types of appliances will be place in kitchen, the position of the extractor fan, the kitchen and layout design, etc. are discussed with the kitchen consultant.

Step 4
Get the M&E from the kitchen consultant


• Ensure that the M&E points and position are done at the site before installation.

Step 5
Installation of kitchen


Have a good weekend everyone!


Tuesday, 20-May-2008 01:26 Email | Share | | Bookmark
EPF Withdrawal

Setelah lebih kurang 5 tahun menabungkan duit gaji ke dalam EPF, hari ini tibalah masanya kami
untuk mengeluarkan wang di dalam akaun 2.
Suprisingly the process amatlah mudah dan pantas provided we have all the documents needed.

1) IC Copy
2) S&P Agreement Copy
3) Letter Offer from Bank
4) Front cover copy of Bank Book (joint acct not allowed)
5) and lastly to fil in Borang Permohonan Pengeluaran Perumahan Kali Pertama

minus the q time, i think it only took us about 15 mins to get approval.
within 2-4 weeks time the money will be credited into our bank account.




Im a happy little boy.



"Oh No!"



Daddy bertungkus lumus mengisi borang



Fanfan and mummy



the form

*Update (2 June 2008): Hooray! Duit dah masuk! So it's true...in exactly 2 weeks duit dah masuk dalam account.


Saturday, 17-May-2008 00:53 Email | Share | | Bookmark
Stamp Duty, Electricity & Water Deposit

Our payment has been made to Hicom-Gamuda Development Sdn Bhd today.
Some details need to check:

1) Cheque payable to Hicom-Gamuda Development Sdn Bhd
2) Amount of payment RM 590 (RM100 for water + RM490 for electricity & stamp duty)
3) Make sure you crossed you IC copy and write for Syabas & for TNB
4) Make sure you fill in the forms ( TNB & Syabas) correctly.
If you are not sure of your full address, no need to worry. They will help you to fill it in.

Done at finance, we take a look at the progress of our house.
Wawiii, it almost completed. Except the road to our unit is still under construction.
They will first handover the units on first row near KESAS hi-way. That will be
on August / September. Most likely we will get our keys on November / December.
Right now inspection is still on-going. It will take sometimes though.











[<<  <  [1]  2  3  >  >>]    [Archive]

© Pidgin Technologies Ltd. 2016

ns4008464.ip-198-27-69.net